Middle School Replacement – To make the transition from old to new as smooth as possible, construction was divided into multiple phases that replaced the entire existing school with a brand new facility on the same site. Project phasing allowed the students to remain in their current learning environment while the new addition was built on-site. The completed project, designed by CRP Architects, provides new classrooms, science labs, a student commons, a performance stage, athletics gyms, ball fields, and administration space.
.
Previous slide
Next slide