719-570-6060

Commercial &
Residential Builder
Search

Commercial Projects

High School Arena

Trojan Arena

Game on! Trojan Arena under Construction After a decade of visioning and planning, the Trojan Arena is complete.  The arena is a magnet facility for

Read More

A.I.M. Education Center

ACHIEVE. INSPIRE. MOTIVATE. Designed by CRP Architects, the A.I.M. Education Center is designed to house two specialized programs for the District.  The Launch Program serves

Read More

Park Manor East Senior Living

Five-story senior apartments with 20 units.  Each apartment features one bedroom with walk-in closet, one bathroom with shower stall, tub, double sinks, galley kitchen, washer/dryer,

Read More

High School Renovation

School District 3, Widefield High School renovations to 2nd floor classrooms, hallways and teacher’s lounge.  Improvements include new acoustic ceilings, walls at classroom corridors to get

Read More

The Pinery at the Hill

The Pinery at the Hill was a design-build contract for a luxury event center in downtown Colorado Springs.  The existing structure required partial demolition, complete

Read More

Bank of Colorado Branch

New construction of steel frame structure with native Colorado-mined stone exterior. This one story bank includes two drive thru lanes, offices, teller areas with elaborate

Read More

College Gym Refresh

Pikes Peak Community College Gym required a makeover which included remodel of the gym, offices, entrance, locker rooms, and workout facility, a new track, basketball

Read More

Mills Dental Office Building

Design Build project for private dental practice.  5,200 SF with semi-circular reception desk, administration area, patient waiting room, six operatory work stations with panoramic x-ray

Read More

Reck Dental Office Building

Design build two-story dental facility includes seven exam and operatory rooms, a lab room, sterile area and a 580 sf reception/waiting area.  The structure is wood

Read More

Colorado Springs Parking Garage

7-story parking structure for the City of Colorado Springs. This structure consists of Cast in Place Structural Concrete, Structural Precast Construction, Structural Steel, Steel Joist

Read More

Our Lady of the Woods Church

New 7,800 sf Church Building including fan shaped Sanctuary seating 400, Narthex, Adoration Chapel, Ministry Preparation Offices, Coffee Bar, Restrooms, Kitchen, Mechanical and Storage Rooms.

Read More

Mount Carmel Chapel

A 17,189 square foot restoration/renovation of a 1908 church into a health, wellness, and community center.  A five-level building to provide access to an adjoining

Read More

Saint Benedict Church

The project is an adaptive reuse of a barn/loafing shed that the Parish used for its Parish Hall.  The remodel converted the building into the

Read More
Chapel

Mount Saint Francis Chapel

Four-story infill structure between two historic buildings.  The structure consisted of a Chapel with stain glass windows and custom alter, private resident rooms, 50-foot elevator

Read More

Saint Michael Catholic Church

17,000 sf worship and gathering space addition. Steel structure with masonry exterior, incorporating an elaborate interior truss design. Clear span worship area, with no vertical

Read More
Natatorium Pool

Natatorium Improvements

Installation of new pool equipment, painting of structure and ductwork over pool, new flooring and lighting in pool area and locker rooms, new audio equipment,

Read More
Car Dealership

Chapel Hills Ford

New 72,000 sf automobile dealership; construction of showroom, offices, and automobile service bays. This dealership was the first in the Chapel Hills Auto Mall area.

Read More
Design Build Medical Office

Johnson Orthodontics

This two-story, 6,100 sf orthodontics facility includes six orthodontics chairs, lab room, a sterile area, and 300 sf reception/waiting area. This structure is wood framed

Read More
Design Build Office Building

Fountain Sanitation District

New headquarters office for Fountain Sanitation District designed by LKA Partners.  The 14,000 SF headquarters office features a welcoming public entry, natural lighting, offices, and

Read More

Mesa Elementary

Mesa Elementary – Addition and Renovations: The 32,716 square foot addition (phase 1)  for Fountain-Fort Carson School District 8 was completed in January 2021. After

Read More
America the Beautiful Park

America the Beautiful Park

This 16.7-acre park includes a playground, picnic pavilion, restrooms, 40 ft. obelisks, decorative walls and walking paths, and the inspiring Julie Penrose Fountain. Previous Next

Read More
Fountain Middle School

Fountain Middle School

Middle School Replacement –  To make the transition from old to new as smooth as possible, construction was divided into multiple phases that replaced the

Read More