
Natatorium Improvements
Installation of new pool equipment, painting of structure and ductwork over pool, new flooring and lighting in pool area and locker rooms, new audio equipment,
Installation of new pool equipment, painting of structure and ductwork over pool, new flooring and lighting in pool area and locker rooms, new audio equipment,
Mesa Elementary – Addition and Renovations: The 32,716 square foot addition (phase 1) for Fountain-Fort Carson School District 8 was completed in January 2021. After
Middle School Replacement – To make the transition from old to new as smooth as possible, construction was divided into multiple phases that replaced the
Art C. Klein Construction, Inc.
3370 Chelton Loop South | Colorado Springs, CO 80909
info@ackconstruction.com
719-570-6060 | 719-570-9671 Fax
To deliver an experience that serves our clients responsibly while advancing a positive perception of the industry.
Copyright © 2025 Art C. Klein Construction | Privacy Policy | Web design by Studio 2D