
Flying W Ranch Rebuild
The Flying W Ranch burned down in the Waldo Canyon fire in 2012. Many years of planning and development took place before the rebuild of

The Flying W Ranch burned down in the Waldo Canyon fire in 2012. Many years of planning and development took place before the rebuild of

Adaptive reuse of an existing facility into multiple service and wash bays for the City Transit facility.

New construction of steel frame structure with native Colorado-mined stone exterior. This one story bank includes two drive thru lanes, offices, teller areas with elaborate

New 13,000SF structural steel structure with stone and stucco exterior featuring tw0-stories, five drive through banking lanes, walk in vault and elaborate interior finishes.

This project included renovation, demolition of the existing bank lobby wing and the construction of a new 5,180 sf bank lobby wing. The renovation of

Pikes Peak Community College Gym required a makeover which included remodel of the gym, offices, entrance, locker rooms, and workout facility, a new track, basketball


Design Build project for private dental practice. 5,200 SF with semi-circular reception desk, administration area, patient waiting room, six operatory work stations with panoramic x-ray

Design build, 25,000 sf medical building consisting of offices, exam rooms and waiting area. Two-story masonry construction with metal roof details and flat roof EPDM

Design build two-story dental facility includes seven exam and operatory rooms, a lab room, sterile area and a 580 sf reception/waiting area. The structure is wood