
Colorado Springs Metro Transit Facility
Municipal bus transit facility consisting of three buildings on a 7 acre reconditioned brown field site: Administration Building, bus canopy, and bus maintenance facility; which
Municipal bus transit facility consisting of three buildings on a 7 acre reconditioned brown field site: Administration Building, bus canopy, and bus maintenance facility; which
40 room addition to the existing hotel and conference center. Structure is steel frame with masonry exterior, rooms are single or double bedrooms with living
A fire at the Colorado Springs Airport in April 2018 caused extensive damage to The Bristol Tap Room and the Novo Coffee Shop. After the
This project involved construction of an 11,500 sf checked baggage inspection system area, 3,600 sf passenger security screening checkpoint, shell space additions, as well as
This Design/Build project included the construction of two multi-use artificial turf fields and ancillary facilities on 14.98 acres for the use of baseball, softball, soccer,
Beautification of the existing Stadiums at Liberty High School and Air Academy High School for District20. Remodel of the restrooms, team rooms, locker room showers,
This infill project connected existing church to school while creating library, multi purpose room, kitchen, offices. To achieve a high energy efficiency the project was
7-story parking structure for the City of Colorado Springs. This structure consists of Cast in Place Structural Concrete, Structural Precast Construction, Structural Steel, Steel Joist
This building was originally built in 1952 as a four-unit retail building and has had many occupants along the way. It is a 9,269 SF
Art C. Klein Construction, Inc.
3370 Chelton Loop South | Colorado Springs, CO 80909
info@ackconstruction.com
719-570-6060 | 719-570-9671 Fax
To deliver an experience that serves our clients responsibly while advancing a positive perception of the industry.
Copyright © 2025 Art C. Klein Construction | Privacy Policy | Web design by Studio 2D