Reck Dental Office Building
Design build two-story dental facility includes seven exam and operatory rooms, a lab room, sterile area and a 580 sf reception/waiting area. The structure is wood framed with a stucco and stone exterior.
Colorado Springs Metro Transit Facility
Municipal bus transit facility consisting of three buildings on a 7 acre reconditioned brown field site: Administration Building, bus canopy, and bus maintenance facility; which included above ground lifts, indoor fueling station, and indoor wash equipment. The site included pile foundation, structural masonry walls, structural slab floors, and joist and deck roofing on a site […]
Cheyenne Mountain Resort Addition
40 room addition to the existing hotel and conference center. Structure is steel frame with masonry exterior, rooms are single or double bedrooms with living area with kitchenettes.
Bristol Tap Room & NOVO Coffee
A fire at the Colorado Springs Airport in April 2018 caused extensive damage to The Bristol Tap Room and the Novo Coffee Shop. After the cleanup, the restoration happened in two phases with the Bristol Tap Room bar and kitchen reopened in November of 2018 and Novo Coffee reopening in June of 2019. The project […]
Colorado Springs Airport Premiere Lounge
Colorado Springs Airport Expansion
This project involved construction of an 11,500 sf checked baggage inspection system area, 3,600 sf passenger security screening checkpoint, shell space additions, as well as improvements to an integrated communications and operations center. The team preformed renovations to the administrative office and conference areas. The new additions to the terminal were structural steel and precast […]
Multi Purpose Artificial Turf Fields
This Design/Build project included the construction of two multi-use artificial turf fields and ancillary facilities on 14.98 acres for the use of baseball, softball, soccer, and football teams for Fountain Fort Carson School District 8. The sitework included site grading, earthwork, and storm drainage. The scope included portable pitching mounds, chain link fencing, concrete/brick dugouts, […]
District Stadium Improvements
Beautification of the existing Stadiums at Liberty High School and Air Academy High School for District20. Remodel of the restrooms, team rooms, locker room showers, concession stands, ticket booths and press boxes. (Paint, lighting, plumbing fixtures, partitions, flooring, white boards, etc.) New Concession building with 2 ADA restrooms and a new ticket booth at Air […]
Pauline Memorial School and Gym Addition
This infill project connected existing church to school while creating library, multi purpose room, kitchen, offices. To achieve a high energy efficiency the project was completed with Styrofoam/concrete ICF walls with a stucco exterior. The school remained fully occupied and disruptions where coordinated as needed.
Colorado Springs Parking Garage
7-story parking structure for the City of Colorado Springs. This structure consists of Cast in Place Structural Concrete, Structural Precast Construction, Structural Steel, Steel Joist and Decking, Structural Cold Formed Metal Framing. Self PerformanceConcrete Foundations – Flatwork Previous Next